ESR replaces asphalt shingle, cool-roof and Tile Roofs on Los Angeles homes, with full tear-off, new underlayment and flashings, and a permit on every job.
Licensed, CSLB #1079489
Owner is CEO & RMO
No salespeople
5.0 on Google & Yelp
Written estimates
Most Roof leaks start at flashings, valleys and penetrations, not in the middle of the Roof. Every ESR Re-Roof replaces all flashings and drip edge and uses modern synthetic underlayment.
We also handle what is under the Roof: rotten decking, attic ventilation and the cool-roof requirements of California's Title 24 energy code.
Three clear packages with starting prices. Pick one as is, or use it as the starting point for your own scope. Prices are estimates only and are not guaranteed; your final price is set after a site visit.
EssentialSmart value
Shingle Re-Roof
Starting at$21,000*
Up to 2,000 sq ft of Roof (20 squares)
Full tear-off to the Deck
Synthetic underlayment
Architectural shingles (GAF, Owens Corning or CertainTeed)
Use promo code ESRBUILD for an extra 5% off (up to $2,500).
Valid on any package for as long as this promo code is listed on ESRbuild.com. Limited time only. Mention the code when you call or enter it on the estimate form. One code per project; cannot be combined with other offers.
* Prices shown are starting estimates only and are not guaranteed. Every job is different, so your final price is set in a written estimate after a site visit, once ESR has seen the job and confirmed the full scope. Permit and plan-check fees are passed through at cost. Hidden conditions (dry rot, old wiring or Plumbing, hazardous materials) are priced separately. As California law requires, a down payment is never more than $1,000 or 10% of the contract, whichever is less.
A Roof is a system, not just shingles. These are the layers ESR installs, from the attic up. Product images courtesy of Owens Corning.
1. The complete system2. Attic Insulation and rafter vents3. Ice and water barrier4. Intake ventilation5. Underlayment6. Shingles7. Exhaust ventilation8. Hip and ridge shingles
Ideas
More Roof Replacement videos
How it works
Four simple steps
1
Call or send photos
Call (818) 399-2945 or send the form with a few photos.
2
Walkthrough with Udi
The owner and licensed contractor looks at the job in person.
3
Written estimate
A clear scope and price, or one of our packages, in writing.
4
Build and sign off
Udi oversees the work through the final inspection.
Questions
Roof Replacement FAQ
How long does a Re-Roof take?
Most shingle Roofs are done in 2 to 4 days. Tile Roofs take about 1 to 2 weeks.
What if the decking is rotten?
We show you photos and replace damaged sheets at a fixed per-sheet price listed in your estimate.