Residential · Property Mgmt. & HOACSLB #1079489 (818) 399-2945

Service

ADU & Garage Conversions

ESR designs, Permits and builds ADUs and Garage Conversions in Los Angeles and Ventura County, from a studio in an existing two-car garage to a new detached one-bedroom unit.

An ADU is one of the best ways to add rental income or space for family. California law has made them easier to permit, but the plans, Title 24 energy report and utility connections still need to be done right.

We handle the whole process: drawings, engineering, plan check, construction and final sign-off, with Udi on site as the licensed contractor responsible for the job.

See packages & prices

Packages & pricing

ADU & Garage Conversions packages

Three clear packages with starting prices. Pick one as is, or use it as the starting point for your own scope. Prices are estimates only and are not guaranteed; your final price is set after a site visit.

EssentialSmart value

Garage-to-Studio

Starting at$140,000*

About 400 sq ft, existing two-car garage

  • Plans, engineering and permit processing
  • Insulation, Drywall, new Windows and entry door
  • Kitchenette with sink, counter and Cabinets
  • Three-quarter Bathroom
  • Ductless mini-split heating and cooling
  • Luxury vinyl plank floors
Get this package

SignatureMost popular

Garage 1-Bedroom

Starting at$200,000*

About 400 to 450 sq ft

  • Everything in the Essential package
  • Full Kitchen
  • Separate bedroom
  • Heat-pump or tankless Water Heater
  • Sewer and water connections
  • Title 24 compliance
Get this package

PremierTop of the line

Detached New-Build ADU

Starting at$355,000*

Up to 600 sq ft, 1 bedroom / 1 Bathroom, flat lot

  • Design, structural and Title 24 reports
  • Plan check with the city
  • New Foundation and Framing
  • Full Kitchen and Bathroom
  • Utility trenching (up to 75 ft)
  • Solar where Title 24 requires it
Get this package
Limited time

Use promo code ESRBUILD for an extra 5% off (up to $2,500).

Valid on any package for as long as this promo code is listed on ESRbuild.com. Limited time only. Mention the code when you call or enter it on the estimate form. One code per project; cannot be combined with other offers.

Claim the offer

* Prices shown are starting estimates only and are not guaranteed. Every job is different, so your final price is set in a written estimate after a site visit, once ESR has seen the job and confirmed the full scope. Permit and plan-check fees are passed through at cost. Hidden conditions (dry rot, old wiring or Plumbing, hazardous materials) are priced separately. As California law requires, a down payment is never more than $1,000 or 10% of the contract, whichever is less.

Proof

ADU & Garage Conversions projects

Ideas

More ADU & Garage Conversions videos

How it works

Four simple steps

  1. 1

    Call or send photos

    Call (818) 399-2945 or send the form with a few photos.

  2. 2

    Walkthrough with Udi

    The owner and licensed contractor looks at the job in person.

  3. 3

    Written estimate

    A clear scope and price, or one of our packages, in writing.

  4. 4

    Build and sign off

    Udi oversees the work through the final inspection.

Questions

ADU & Garage Conversions FAQ

How long does an ADU take?

Plan approval often takes 2 to 4 months. Construction is about 3 to 4 months for a Garage Conversion and 5 to 8 months for a detached unit.

What is not included?

School and impact fees, main panel or sewer upgrades, fire sprinklers, and work on sloped or hard-to-reach lots are quoted separately when needed.

Areas

Where we offer ADU & Garage Conversions

More

Other popular services

* Starting prices are estimates only and are not guaranteed. Your final price is set in a written estimate after a site visit.

Talk to the person who runs the job

Tell us what needs fixing.

Send photos and an address, or call. Udi personally reviews every request.

Call (818) 399-2945Request an estimate